Mrs Morrissey called to advise that there is possibly and issue with the unit but it is due a service in August anyway so we will do this at the same time. . **Booked for 30th June - AM appointment** This service includes one wastewater engineer attending onsite for up to one hour, along with all travel and mileage costs. If any additional parts or labour are required, these will be discussed and agreed with you onsite before any extra costs are incurred. If you have any questions or need further information, please don’t hesitate to contact us on 01773 767612 or via email at [email protected]. Thank you for your continued custom.
Full Address: Sandy hill farm, Alrewas, Burton-on-Trent DE13 7DW, UK
Site: Foot Steps Nursery
Description:
Detailed: Standard service to your off mains drainage system. Includes one number wastewater engineer onsite for up to one hour, travel & mileage. Any additional parts or labour required will be agreed with you onsite before any additional costs are incurred.
Full Address: Elvaston, Thulston, Derby DE72 3EP, UK
Site: Elvaston Castle (File 8)
Equipment: Twin Crude Pump Station - Castle. The pumphouse gate and pumphouse have the coded lock 3361
Description:
Callout to your off mains drainage system. Includes one hour onsite. Site - Elvaston Castle - Castle Pump Station - DE72 3EP Callout to red light flashing - attending site 26/06/26 Booked with John Thompson Order No 8500081140 Vendor number: 20005401 Any additional parts or labour required will be agreed with you onsite before any additional costs are incurred.
called and emailed 25/06 Your routine service for your off-mains drainage system is due in July 2026. This service includes one wastewater engineer attending onsite for up to one hour, along with all travel and mileage costs. If any additional parts or labour are required, these will be discussed and agreed with you onsite before any extra costs are incurred. We will contact you over the coming weeks to arrange a convenient date to ensure your system is serviced on time. If you have preferred dates, please let us know by accepting the quotation and entering your availability. If you have any questions or need further information, please don’t hesitate to contact us on 01773 767612 or via email at [email protected]. Thank you for your continued custom.
Equipment: Pump Station (with Tricel Vento ST & Puraflo)
Description:
Alarm sounding on unit Callout to your off mains drainage system. Includes one hour onsite. Any additional parts or labour required will be agreed with you onsite before any additional costs are incurred.
Your routine service for your off-mains drainage system is due in July 2026. This service includes one wastewater engineer attending onsite for up to one hour, along with all travel and mileage costs. If any additional parts or labour are required, these will be discussed and agreed with you onsite before any extra costs are incurred. We will contact you over the coming weeks to arrange a convenient date to ensure your system is serviced on time. If you have preferred dates, please let us know by accepting the quotation and entering your availability. If you have any questions or need further information, please don’t hesitate to contact us on 01773 767612 or via email at [email protected]. Thank you for your continued custom.
Full Address: Sandmartin House, Oak Tree Lane, Mansfield, Nottinghamshire, NG18 4LF, UK
Description:
order number 005934. 2No Engineers for up to three hours 1No Bg10 motor1No 1120 belt 1No Top pulley Following our recent telephone conversation, please find our quotation to attend site following the reported flooding, carry out remedial works to the affected areas, and inspect the pumping station to identify any faults or issues that may have contributed to the incident.
Full Address: Pindale Road Hope Works Derbyshire, Hope Valley S33 6RP, UK
Site: Breedon Quarry
Description:
2No Engineers on site for up to 8 hours Following our recent site visit, our engineer has advised that further works are required on your sewage treatment system. Please note that this quotation is subject to the following site provisions: Suitable lifting equipment, together with a competent operator (if required), must be provided on site. The equipment must be fully tested, certified, and of sufficient capacity to safely lift the media bale. The correct replacement bearings must be supplied by the site. Scope of Works Utilise the site's lifting equipment to remove the media bale or lift the bale and gain access to the sprocket. Remove and replace the existing sprockets and chain supplied by the site. Reinstall the media bale and carry out operational checks to ensure the system is functioning correctly and as designed before leaving site.
2No engineers on site for up to 2 hours De-sludge up to 2000gExtra high pressure jetter on site for up to an hour 1No 10b2 chain 1No Top Sprocket1No Bottom Sprocket 1No Grease extender1No Grease brush 1No Chain grease Following on from our recent site visit, our engineer has advised that further works are required on your sewage system.
Eurotech booked for 8am - Kirsty dealt with Thank you for your recent enquiry for a sewage system compliance/condition check. You have advised that you require a basic survey which includes: - Carrying out an assessment of your current tank and discharge to advise if the system is compliant including x1 hour onsite - Report on compliance of your system - Report on condition of your system - Remedial options and costs if required - Dye test of all accessible downpipes/guttering at ground level Please note that the results may be inconclusive depending on the normal working levels within the tank, access to the outlet and access to the downpipes. We would recommend that you have a desludge of the system at the time of our visit as a minimum. A price for this is listed below but we do understand that you may wish to utilise your existing contractor for this aspect. Please speak to us if you are not sure what level of survey is required.
Full Address: Woodfall Lane, Low Bradfield, Sheffield S6 6LA, UK
Site: Cricket View Cafe
Equipment: Marsh Ensign 25PE Gravity outlet
Description:
Cricket view Cafe 1No Engineer on site for up to 4 hours1No Replacement panel1No Beacon1No Orange float1No Blower housing 1No Concrete slab1No Resin jointing kit1No Cable extension 1No airline extension ducting 3No 3/4" hose tail connectors Following on from our recent site visit, our engineer has advised that further works are required on your sewage system. Option 2 New compressor housing to move panel and compressor out of the unit.
Called and left VM, emailed 09/06 Your routine service for your off-mains drainage systems is due in June 2026. Tricel UK18 Tricel UK6 This service includes one wastewater engineer attending onsite for up to one hour, along with all travel and mileage costs. If any additional parts or labour are required, these will be discussed and agreed with you onsite before any extra costs are incurred. We will contact you over the coming weeks to arrange a convenient date to ensure your system is serviced on time. If you have preferred dates, please let us know by accepting the quotation and entering your availability. If you have any questions or need further information, please don’t hesitate to contact us on 01773 767612 or via email at [email protected]. Thank you for your continued custom.
Full Address: Bine Farm, Wootton Brook, Bridgnorth WV15 6EB, UK
Site: The Old Barn
Equipment: Klargester FA
Description:
Thanks Esther Yes Tuesday would be ok for us We look after our grandson on Tuesday mornings so if we are not there I will leave the gate closed but unlocked I will be there in the afternoon Detailed: Standard service to your off mains drainage system. Includes one number wastewater engineer onsite for up to one hour, travel & mileage. Any additional parts or labour required will be agreed with you onsite before any additional costs are incurred.
**TAKE THE TWO BOTTLES OF BACTERIA ON THE REMEDIAL SHELF AND PUT IN THE KIOSK ONSITE AND CALL GEORGE WHEN 30 MINS AWAY HE WOULD LIKE TO MEET YOU ONSITE** Sample- Influent and effluent sample same as the other fuji's and please ensure the "eel catcher” is checked on the outlet each time - Leave in sample fridge for testing
Full Address: Troutbeck, Windermere LA23 1PH - W3W – anguished.pipeline.shell
Site: Troutbeck
Equipment: FujiClean CRX30
Description:
Fuji sample - Influent and effluent Please take checklist and complete one on each visit - Photo of this must be submitted on each visit Take sample and influent and effluent to be brought back to the Office for testing Please complete the checklist within the kiosk on each visit. A photo of the completed check list must be sent through after each sample visit
Take Samples please Further to our recent telephone conversation, please find below the quotation for an engineer to attend site and collect a sample of the effluent. The sample will be submitted to an accredited laboratory for analysis, and a copy of the test results will be provided to you upon completion. Please note that the laboratory testing process typically takes 3–4 weeks.
Full Address: Field Farm Cottage, Porton, Salisbury SP4 0NF, UK
Site: Field Farm Cottage
Equipment: FujiClean CRXII 10
Description:
NEEDS BOOKING IN WITH CHRIS Gate code is 5689#. Just a heads up, the electrodes alarm light is still flashing for the plant serving the glamping pods… Has been going for a few weeks now, not sure if its an issue May - Passing visit to collect Fuji samples Samples for COD, TSS, NH4, TN, P & IRON please. Once a month will be absolutely fine if we can
**TAKE THE TWO BOTTLES OF BACTERIA ON THE REMEDIAL SHELF AND PUT IN THE KIOSK ONSITE AND CALL GEORGE WHEN 30 MINS AWAY HE WOULD LIKE TO MEET YOU ONSITE** Sample- Influent and effluent sample same as the other fuji's and please ensure the "eel catcher” is checked on the outlet each time - Leave in sample fridge for testing
Full Address: Troutbeck, Windermere LA23 1PH - W3W – anguished.pipeline.shell
Site: Troutbeck
Equipment: FujiClean CRX30
Description:
Fuji sample - Influent and effluent Please take checklist and complete one on each visit - Photo of this must be submitted on each visit Take sample and influent and effluent to be brought back to the Office for testing Please complete the checklist within the kiosk on each visit. A photo of the completed check list must be sent through after each sample visit
Take Samples please Further to our recent telephone conversation, please find below the quotation for an engineer to attend site and collect a sample of the effluent. The sample will be submitted to an accredited laboratory for analysis, and a copy of the test results will be provided to you upon completion. Please note that the laboratory testing process typically takes 3–4 weeks.